Product Guides
GHG Protocol tutorial: measure your full carbon footprint in Dcycle
A guided, top-to-bottom walkthrough of a GHG Protocol inventory in Dcycle — Scope 1, Scope 2 and Scope 3, with a screenshot guide for every category Dcycle supports.
The GHG Protocol Corporate Standard splits your footprint into three scopes: Scope 1 (direct emissions you control), Scope 2 (energy you buy), and Scope 3 (everything in your value chain). This tutorial walks through building a full inventory in Dcycle, one category at a time — each step links to a short, focused guide with real screenshots of the upload flow.
Total time if you work through every guide: roughly 45–60 minutes, plus however long it takes to gather your source documents (invoices, fuel card exports, purchase ledgers…).
Before you start
Set up the basics first — they're a prerequisite for almost everything below: Setting up your facilities in Dcycle, Configure a fiscal year other than calendar year, and Invite a team member if colleagues will help enter data.
Scope 1 — Direct emissions
Emissions from sources you own or control: fuel you burn, gas that leaks from your equipment, fuel your fleet burns.
| Category | Guide |
|---|---|
| Mobile combustion (fleet vehicles) | Register vehicles and fleet fuel in Dcycle |
| Stationary combustion (gas, diesel, heat) | Upload a stationary combustion invoice |
| Fugitive emissions (refrigerant recharges) | Add a refrigerant recharge |
Industrial process emissions
Run a cement, lime, steel, aluminium, glass, ceramics, chemicals or pulp & paper process? Those emissions come from the chemical reaction itself, not from burning fuel, and need a custom emission factor. See Process emissions: what to collect by industry.
Scope 2 — Energy you buy
Emissions from electricity, heating or cooling purchased from a supplier.
| Category | Guide |
|---|---|
| Electricity invoices | Upload an electricity invoice |
| Electricity (Spain, automatic) | Connect Datadis for automatic electricity data |
| Renewable electricity certificates | Set electricity emissions to zero with a Guarantee of Origin |
District heating and cooling use the same “Combustion” facility tab as stationary combustion, above — ask your Customer Success contact to activate it if your facilities receive heat or cold from a district network.
Scope 3 — Your value chain
The GHG Protocol defines 15 Scope 3 categories. Not every organisation reports on all 15 — start with what’s material to your business — but here’s what Dcycle supports today, and where to find each one.
| Category | Guide |
|---|---|
| 1 — Purchased goods & services | Upload purchases and capital goods (CapEx) |
| 1 — Water (facility portion) | Upload a water invoice |
| 2 — Capital goods | Same guide as Category 1 — see Upload purchases and capital goods (CapEx) |
| 3 — Fuel- & energy-related activities | Calculated automatically from Scope 1 & 2 data — see Scope 3 Category 3: fuel- and energy-related activities for what’s included and why renewable energy still shows emissions here |
| 4 — Upstream transportation & distribution | Upload goods received |
| 5 — Waste generated in operations | Upload a waste collection record |
| 6 — Business travel | Upload business travel data in Dcycle |
| 7 — Employee commuting | Upload employees (prerequisite), then Resend the survey to pending employees and Estimate emissions for employees who didn’t answer |
| 9 — Downstream transportation & distribution | Upload goods shipped |
| 10, 11, 12 — Processing, use, and end-of-life of sold products | Upload product use and end-of-life data for summary reporting, or Dcycle’s LCA module for a full material-flow model — see Starting an LCA in Dcycle: data collection checklist |
Categories 8, 13, 14, 15 — leased assets, franchises, investments
Upstream/downstream leased assets (8, 13) aren't a separate module in Dcycle — they're typically rolled into the lessor's Scope 1 & 2 or the lessee's facilities, depending on the approach you choose. Franchises (14) and investments (15) are more specialised, sector-specific flows (financed emissions, franchisee data collection) — talk to your Customer Success contact to configure them for your account.
Reference: full data checklists
Before you upload anything, it helps to know exactly what fields each category needs and where to source them:
Next steps
Once your primary data is in, head to Reporting to filter your emissions, export to Excel, and generate CSRD / EINF / GHG inventory reports — or Customization if you need to override a default emission factor with a supplier-specific or custom one.
Was this helpful?
What was missing or unclear? (optional)
Sent. Thank you for helping us improve.
Up next
Setting up your facilities in DcycleCreate the facilities (sites, buildings, plants) that your Scope 1 and Scope 2 consumption data will be attached to.
Read more → Facilities & corporate vehicles: data collection (Scope 1, 2, 3)A practical checklist of the primary data you need for your facilities and corporate vehicles across Scope 1, 2 and 3 — combustion, recharges, vehicles, process, electricity, district heating, water and waste.
Read more → Scope 3 data collection checklistA practical checklist of the Scope 3 categories available in Dcycle — what data to gather, in what format, for each value-chain category.
Read more →