Product Guides
Load your Scope 1, 2 and environmental data
The correct order and step-by-step guides for entering combustion, refrigerant gas, fleet, electricity, water, and waste data into Dcycle for an EINF report.
The order matters: all consumption data attaches to facilities, so you create those first. Once facilities exist, you can upload data for any category in any sequence.
Each guide linked below takes 3–5 minutes to read. The upload flow in the app is consistent across all categories — choose the facility, upload an invoice or CSV, and review.
Step 1 — Create your facilities
A facility is any site, building, warehouse, or store that has energy or water consumption. Every invoice you upload will be linked to one.
Create one facility per physical location, using its real name. Avoid generic names — your verifier will ask for traceability by site, and a name like “Main office” or “General data” won’t satisfy that requirement.
Guide: Setting up your facilities in Dcycle
Step 2 — Electricity
Via Datadis (fastest for Spanish supply points): Connect Datadis and Dcycle automatically imports your full-year consumption for every CUPS — no manual invoice uploads needed.
Guide: Connect Datadis for automatic electricity data
Manually (if Datadis doesn’t cover a supply point): Upload each invoice directly from the facility’s Electricity tab.
Guide: Upload an electricity invoice
Step 3 — Fixed combustion (gas, diesel, propane)
Scope 1. Use the same upload flow as electricity, selecting the correct fuel type for each invoice.
Guide: Upload a stationary combustion invoice
Step 4 — Refrigerant gas recharges
Scope 1 (fugitive emissions). Enter the kg recharged and the gas type from each maintenance report. You report what was recharged during the year — under the GHG Protocol, the recharge amount equals the estimated leak.
Guide: Add a refrigerant recharge (fugitive emissions)
Step 5 — Fleet vehicles and fuel
Scope 1 (mobile combustion). Register each vehicle first, then add its annual fuel consumption. You can register vehicles in bulk using a CSV file.
Guide: Register vehicles and fleet fuel in Dcycle
Step 6 — Water and waste
Not Scope 1 or 2, but the Environmental pillar of the EINF explicitly requires water consumption data and waste metrics. Upload them the same way as any invoice.
Guide: Upload a water invoice
Guide: Upload a waste collection record
Uploading many records at once
If you have dozens of supply points or vehicles, download the CSV template for that category, fill it in, and upload it in a single step rather than invoice by invoice.
Guide: Import data via CSV template
Was this helpful?
What was missing or unclear? (optional)
Sent. Thank you for helping us improve.
Up next
EINF data checklist: what to collect before you startWhich invoices, maintenance records, and fuel reports to gather for each Scope 1, Scope 2, and environmental EINF category before loading data into Dcycle.
Read more → Verify your data before reportingHow to confirm all uploaded files are fully processed, trigger a recalculation if needed, and export your emission totals to Excel to reconcile against source documents before closing the year.
Read more → Setting up your facilities in DcycleCreate the facilities (sites, buildings, plants) that your Scope 1 and Scope 2 consumption data will be attached to.
Read more → Connect Datadis for automatic electricity dataSet up the Datadis integration to automatically import your electricity consumption data.
Read more →