Product Guides
EINF data checklist: what to collect before you start
Which invoices, maintenance records, and fuel reports to gather for each Scope 1, Scope 2, and environmental EINF category before loading data into Dcycle.
This checklist covers the documents you need before loading data into Dcycle for an EINF under Ley 11/2018. Collect everything below before opening the platform — it is faster to upload in one session than to pause and track down documents while forms are open.
Scope 1 — Fixed combustion
Gas, diesel, or propane used in boilers, heaters, and generators.
| What to collect | Format | Who has it |
|---|---|---|
| Natural gas invoices — all 12 months | PDF invoice or Excel with kWh per month | Procurement / facilities |
| Diesel or propane invoices — all 12 months | PDF invoice or litres per month | Procurement / facilities |
If a facility uses district heating, confirm with your Customer Success contact how it should be categorised before uploading.
Scope 1 — Refrigerant gases
Often overlooked
Refrigerant recharges are the most frequently missed data category in EINF submissions. For companies with refrigerated storage or commercial air conditioning, they can represent more than half of all Scope 1 emissions. Request records from your maintenance provider before doing anything else — missing them will be flagged by the verifier.
| What to collect | Format | Who has it |
|---|---|---|
| Annual maintenance records for refrigeration and HVAC systems | Report listing kg recharged and gas type (R-404A, R-134a, R-410A…) | Cold-chain or HVAC maintenance contractor |
Under the GHG Protocol, the amount recharged during the year equals the amount that leaked — you report recharges, not estimates.
Scope 1 — Fleet vehicles
Fuel consumed by vehicles owned or leased by the organisation.
| What to collect | Format | Who has it |
|---|---|---|
| Annual fuel consumption per vehicle | Litres per vehicle, or total spend in € with plate number | Fuel card provider or fleet manager |
If you have a fuel card contract, the provider can usually export a full-year summary in Excel.
Scope 2 — Electricity
Electricity purchased from the grid at every supply point.
| What to collect | Format | Who has it |
|---|---|---|
| Electricity invoices — one per supply point (CUPS), all 12 months | PDF invoice | Your electricity retailer |
| OR: Datadis credentials | Log in to Datadis and authorise Dcycle — no invoices needed | You (if your organisation is registered on Datadis) |
For Spanish supply points, connecting Datadis pulls all your CUPS automatically and is the fastest path.
Environmental — Water and waste
Required by the Environmental pillar of the EINF, but not part of Scope 1 or 2 greenhouse gas emissions.
| What to collect | Format | Who has it |
|---|---|---|
| Water invoices — all 12 months, all supply points | PDF invoice | Facilities / procurement |
| Waste collection records — full year | Manifests or certificates from your waste management company, listing weight by waste type | Facilities / EHS |
Waste records must distinguish between hazardous and non-hazardous waste, and where possible between recovery and disposal.
What you do NOT need
For a standard Ley 11/2018 EINF covering Scope 1 and 2, the following categories are not required:
- Purchased goods and services (Scope 3, Category 1)
- Business travel and employee commuting (Scope 3, Categories 6–7)
- Goods shipped to customers (Scope 3, Category 9)
- Capital goods / CapEx (Scope 3, Category 2)
If your sustainability strategy includes Scope 3, you can load that data alongside your Scope 1 and 2 — it won’t affect your EINF compliance, and it will be available for other reports.
Was this helpful?
What was missing or unclear? (optional)
Sent. Thank you for helping us improve.
Up next
EINF tutorial: prepare your report in DcycleA guided walkthrough for completing an EINF under Ley 11/2018 in Dcycle — from configuring your project and loading Scope 1 and 2 data to answering the 78 disclosure requirements and generating the verified report.
Read more → Load your Scope 1, 2 and environmental dataThe correct order and step-by-step guides for entering combustion, refrigerant gas, fleet, electricity, water, and waste data into Dcycle for an EINF report.
Read more → Facilities & corporate vehicles: data collection (Scope 1, 2, 3)A practical checklist of the primary data you need for your facilities and corporate vehicles across Scope 1, 2 and 3 — combustion, recharges, vehicles, process, electricity, district heating, water and waste.
Read more →